walking to get our hard hats
|
North facade
|
Entrance to construction trailer
|
Signing in at construction trailer
|
Our hard hats were pink
|
Gene's hard hat needed adjusting
|
Tom's hard hat was too small
|
South approach to the A wing
|
The gang approaches the building
|
The A wing windows reflect on Crerar
|
The gang goes in the main entrance
|
detail of tiles at main entrance
|
Heading down the diagonal corridor of A wing
|
Here's your new office, Professor!
|
View from ground floor office window
|
the Canyon, from first floor office
|
The first floor lounge A wing
|
First floor lounge looking southwest
|
peering up through the 2nd floor well
|
Heading up to the 2nd floor A wing
|
The second floor well from above
|
The second floor lounge
|
John checks out some ceiling material
|
The stairs at the second floor level are open!
|
a row of chem labs 2nd floor 57th street side
|
view from north-facing lab
|
Between Kersten and the IRB
|
the bowels of the earth
|
giant posts at sub-basement level
|
a sub-basement lab
|